← All drafts
Draft #6632 quality rejected Created May 12, 2026, 01:06:40

Pipeline run for this draft

Generated note

The report describes two unapproved or unbilled QTS water connections and over 29M gallons later billed retroactively. It says QTS was charged, but does not report a fine or formal legal penalty. https://www.eenews.net/articles/georgia-residents-seethe-over-30m-gallons-of-missing-water/

Source post

A data center in Georgia used 30 million gallons of water illegally, and locals only noticed when their water pressure was abnormally low. The data center claimed it was an honest mistake, but locals were told by the town to conserve water while the data center kept running. https://t.co/4aMLXYcL4j

May 11, 2026, 01:04:09 Open on X →

Pipeline steps

11 steps
Step #1

generate_note.pre_filter

Success
Started
May 12, 2026, 01:06:40
Finished
May 12, 2026, 01:06:46
Duration
5.78 s

Input snapshot

{
  "post_text": "[Target Post]\nA data center in Georgia used 30 million gallons of water illegally, and locals only noticed when their water pressure was abnormally low.\n\nThe data center claimed it was an honest mistake, but locals were told by the town to conserve water while the data center kept running. https://t.co/4aMLXYcL4j\n(This post has 2 attached image(s))\n\n[Suggested source links from requests]\nhttps://x.com/andymasley/status/2053297952379002883"
}

Output snapshot

{
  "has_factual_claims": true
}